[Home ] [Archive]   [ فارسی ]  
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Contact ::
Main Menu
Home::
Journal Information::
Articles archive::
Publication Ethics::
Peer Review Process::
Indexing Databases::
For Authors::
For Reviewers::
Subscription::
Contact us::
Site Facilities::
::
Google Scholar Metrics

Citation Indices from GS

AllSince 2019
Citations63163624
h-index2719
i10-index18678

..
Search in website

Advanced Search
..
Receive site information
Enter your Email in the following box to receive the site news and information.
..
Registered in

AWT IMAGE

AWT IMAGE

..
:: Volume 23, Issue 2 (inpress 2015) ::
Journal of Ilam University of Medical Sciences 2015, 23(2): 12-20 Back to browse issues page
Detection of Hazards and Risk Assessment by ETBA Method in Central Heating System in Kashan Shahid Beheshti Hospital in 2013
Vali Sarsangi1 , Hojat Kakaee * 2, Hajar Poormorad3 , Hajar Forooghi dehnavi3 , Ehsan Aboee4 , Aziz Rahimizade1 , Abbas Nasroolahi5
1- Hormozgan University of Medical Science
2- ilam university of medical science , hojat.kakaee@yahoo.com
3- kashan university of medical science
4- North Khorasan University of Medical Sciencesity of medical science
5- ilam university of medical science
Abstract:   (9876 Views)

Introduction: In the developed and modern world, all things are depended on complicated and risky technology. Hospitals are also among the high-risk areas that observances of safety considerations in different hospital section lead to reduce likely risk and lawsuits. Central heating system is like a hospital hearts that not only helps to create air conditioning but also helps to improve patient's condition. The aim of this study was to detection of hazards and risk assessment by ETBA method in central heating System in Kashan Shahid Beheshti hospital in 2013.
 Materials & methods: This case study was conducted in the Kashan shahid beheshti hospital central heating system in 2013. ETBA method was used to hazards identification and risk assessment. Required information for this study was collected by field observations, interview with staff and engineers, energy checklist, investigation of technical documents and available maps by investigation team. Findings: overall, 8 energy and 35 potential risks were identified that among them, the risk of 12 hazards was estimated unacceptable, 20 risks was estimated unfavorable and 3 risks was estimated acceptable.
 Discussion & Conclusion: regarding to high number of identified hazards and associated risks which is related to them it is necessary that corrective measures to be taken to reduce the risk of hazards level in this place.

Keywords: Risk, Hazard, Risk assessment, ETBA, Central heating system
Full-Text [PDF 491 kb]   (4007 Downloads)    
Type of Study: Research | Subject: Health professionals
Received: 2014/03/6 | Accepted: 2014/07/21 | Published: 2015/07/13
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML   Persian Abstract   Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

sarsangi V, kakaee H, poormorad H, forooghi dehnavi H, aboee E, rahimizade A et al . Detection of Hazards and Risk Assessment by ETBA Method in Central Heating System in Kashan Shahid Beheshti Hospital in 2013. J. Ilam Uni. Med. Sci. 2015; 23 (2) :12-20
URL: http://sjimu.medilam.ac.ir/article-1-1648-en.html


Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 23, Issue 2 (inpress 2015) Back to browse issues page
مجله دانشگاه علوم پزشکی ایلام Journal of Ilam University of Medical Sciences
Persian site map - English site map - Created in 0.15 seconds with 41 queries by YEKTAWEB 4646